About DALEEL
Daleel Petroleum
was established in 2002, as a joint venture between Mezoon Petrogas SAOC
(Subsidiary of MB Holding) and Mezoon Petrogas BVI (Subsidiary of China
National Petroleum Corporation). Our main stakeholder is the Government of the
Sultanate of Oman.
Our operations
from the beginning can be broken down into three stages. The first stage was
from 2002 until 2004, which was “the study and understanding period” when we
were only producing enough oil to cover our costs.
From 2004 until
2007, we had a period of “stable increases. The direction was towards
extracting the easy oil with the original energy. In this second stage the
focus was mainly diverted to the Daleel field. This is the phase of adaptation
to new technology that was extended in application across the entire Daleel
area.
In the third
stage from 2008 until today, Daleel experienced a period referred to as the
“jump increase”. Our production charts, reflected a dramatic increase of about
20% per year during this period.
The estimated reserves were several million barrels in 2002.
In 2013, the estimated reserves were almost 30 times more. This resulted from
extended exploration activities and the application of advanced recovery
techniques.
Moving forward, Daleel will be focusing on construction and
upgrading its facilities. This will upgrade our capacity and release the
constraints to grow our operations.
Job Position
|
Location
|
Action
|
Senior Electrical Technician
|
OMAN
|
|
Quantity Surveying Engineer
|
OMAN
|
|
Lab Technician
|
OMAN
|
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.